ALSTOM

ALSTOM 9713-4021 Basic I/O Interface Board

Module Installation

The Fieldbus Modules are peripherals of the TCP/IP Ethernet module (9716-4020).

Prior to the installation of any Fieldbus modules, ensure that a TCP/IP Ethernet module

is correctly installed and configured. Refer to the GEM80-500 Series Controller

Technical Manual for installation instructions and the GEMLAN-T Technical Manual for

configuration instructions for the TCP/IP Ethernet module.

Before installation, the Fieldbus module must be hardware configured by setting the

Module Identification rotary switch. Refer to section 4.3.

With the controller powered down remove the front panel mains and watchdog

connector. Move the controller to a suitable location and proceed as follows, noting

that all references to left and right refer to the controller when viewed from the front.

(a) Release the upper right-hand side cover and power supply assembly. Lay the

controller down on its left-hand side and remove the four M3 Pozi-pan head

earthing/grounding screws. Retain for re-assembly.

(b) Lift the cover and slide the louvered side under the controller.

(c) The TCP/IP Ethernet module should now be visible. This is retained using four M3 x

6 mm screws and spring washers. Remove these screws and washers and retain for

re-assembly.

(d) Secure the TCP/IP Ethernet module in position by substituting 4 mounting pillars for

the M3 x 6mm screws.

(e) The site is now ready to receive a Fieldbus module.

(f) Check that the connector pins on the underside of the Fieldbus module are correctly

aligned. Orientate the module so that the matching connectors are in line. Gently

push the connector halves together until the module sits flat on the mounting

pillars.

(g) Insert the front panel mounted Fieldbus and diagnostic ribbon cables to their

associated headers.

(h) Secure the Fieldbus module in position using 4 more mounting pillars.

RELIANCE E243
RELIANCE MC-D5006-A
RELIANCE S-D4006
RELIANCE S-D4006-F
RELIANCE S-D4007
RELIANCE S-D4008
RELIANCE S-D4009-D
RELIANCE S-D4011-E
RELIANCE S-D4030-A
RELIANCE S-D4039
RELIANCE S-D4041
RELIANCE S-D4043
RELIANCE S0-60065
RELIANCE SR3000 2SR40700

If all required Fieldbus modules are now fitted proceed at instruction (j), otherwise

continue at instruction (e).

The site is now ready to receive the power converter module.

Check that the connector pins on the underside of the power converter module are

correctly aligned. Orientate the module so that the matching connectors are in line

and the mounting holes correspond with the two mounting pillars nearest to the

front of the controller. Gently push the connector halves together until the module

sits flat on the mounting pillars.

Secure the power converter module in position with 2 of the screws and washers

removed at instruction (c). The unused screws and washers may be stored in the

other two mounting pillars.

(m)  Remove a blanking panel from the front of the controller, to make space for each

of the Fieldbus module front panels. The blanking panels are secured with two M3

Pozi-pan screws, remove and retain the screws.

(n) Secure the Fieldbus front panel(s) in position using the screws removed at

instruction (m).

(o) Replace the upper right-hand side cover and power supply assembly.  Secure in

position using the screws removed at instruction (a).

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注