OMRON

OMRON C200H-RT201 PROGRAMMABLE CONTROLLER

OMRON C200H-RT201

High-density I/O Units are designed to provide high-density I/O capability and

include Group 2 High-density I/O Units and Special I/O High-density I/O Units.

Special I/O Units are dedicated Units that are designed to meet specific needs.

These include some of the High-density I/O Units, Position Control Units, High

speed Counter Units, and Analog I/O Units.

Link Units are used to create Link Systems that link more than one PC or link a

single PC to remote I/O points. Link Units include Remote I/O Units, PC Link

Units, Host Link Units, SYSMAC NET Link Units, and SYSMAC LINK Units.

SYSMAC NET Link and SYSMAC LINK Units can be used with the CPU11 only.

Other product groups include Programming Devices, Peripheral Devices,

and DIN Rail Products.

The following are the basic steps involved in programming and operating a

C200H. Assuming you have already purchased one or more of these PCs, you

must have a reasonable idea of the required information for steps one and two,

which are discussed briefly below. This manual is written to explain steps three

through six, eight, and nine. The relevant sections of this manual that provide

more information are listed with each of these steps.

1. 2. 3…

Control System Design

1. Determine what the controlled system must do, in what order, and at what

times.

Beckhoff AM8053-0L2B-0000

Beckhoff CP2916-0000 Industrial HMI Display Panel

Beckhoff C6650-0060 Industrial PC Control Cabinet

NEW Beckhoff CX1010-0111 BASIC CPU MODULE CPU WITH ETHERNET + COM1

Beckhoff CP3918-0000 Multi-Touch 18.5″ Control Panel

Beckhoff CX2030-0125 Basic CPU Module, TwinCAT 3. RJ45. DVI-I, 24VDC *

New Beckhoff CX2020-0121 Module

B&R Acopos 1090 servo drive 8V1090.00-2

Beckhoff Touch Panel Screen CP6020 -0000-0000

Beckhoff EK9000/EK 9000

BECKHOFF CP7037-1037-0010 OPERATOR INTERFACE TOUCHSCREEN

Beckhoff CX5120-0155/2GB Embedded PC

BECKHOFF CP7709-0001-0020 HMI

Beckhoff EL7332 PLC Module EL 7332

B&R 5D2500 41 Display Control Panel +24 VDC

Beckhoff CX9020-0111 module with

​2. Determine what Racks and what Units will be required. Refer to the C200H

Installation Guide. If a Link System is required, refer to the appropriate Sys

tem Manual.

3. On paper, assign all input and output devices to I/O points on Units and de

termine which I/O bits will be allocated to each. If the PC includes Special I/O

Units or Link Systems, refer to the individual Operation Manuals or System

Manuals for details on I/O bit allocation. (Section 3 Memory Areas)

4. Using relay ladder symbols, write a program that represents the sequence

of required operations and their inter-relationships. Be sure to also program

appropriate responses for all possible emergency situations. (Section 4

Writing ana Inputting the Program, Section 5 Instruction Set, Section 6 Pro

gram Execution Timing)

5. Input the program and all required operating parameters into the PC. (Sec

tion 4-7 Inputting, Modifying, and Checking the Program.)

6. Debug the program, first to eliminate any syntax errors, and then to find ex

ecution errors. (Section 4-7 Inputting, Modifying, and Checking the Pro

gram, Section 7 Program Monitoring and Execution, and Section 8

Troubleshooting)

7. Wire the PC to the controlled system. This step can actually be started as

soon as step 3 has been completed. Refer to the C200H Installation Guide

and to Operation Manuals and System Manuals for details on individual

Units.

8. Test the program in an actual control situation and carry out fine tuning as

required. (Section 7 Program Monitoring and Execution and Section 8

Troubleshooting)

9. Record two copies of the finished program on masters and store them safely

in different locations. (Section 4-7 Inputting, Modifying, and Checking the

Program)

Designing the Control System is the first step in automating any process. A PC

can be programmed and operated only after the overall Control System is fully

understood. Designing the Control System requires, first of all, a thorough un

derstanding of the system that is to be controlled. The first step in designing a

Control System is thus determining the requirements of the controlled system

The first thing that must be assessed is the number of input and output points

that the controlled system will require. This is done by identifying each device

that is to send an input signal to the PC or which is to receive an output signal

from the PC. Keep in mind that the number of I/O points available depends on

the configuration of the PC. Refer to 3-3 IR Area for details on I/O capacity and

the allocation of I/O bits to I/O points.

Next, determine the sequence in which control operations are to occur and the

relative timing of the operations. Identify the physical relationships between the

I/O devices as well as the kinds of responses that should occur between them.

For instance, a photoelectric switch might be functionally tied to a motor by way

of a counter within the PC. When the PC receives an input from a start switch, it

could start the motor. The PC could then stop the motor when the counter has

received a specified number of input signals from the photoelectric switch.

Each of the related tasks must be similarly determined, from the beginning of the

control operation to the end.