Honeywell

Honeywell STI‑CE Smart Transmitter Interface 51304516‑150

STI‑CE Smart Transmitter Interface 51304516‑150

International models (240 Vac) of the Enhanced Micro TDC3000 Control System are

equipped with 1.8 meter (6foot) power cords having CEE-7 standard VII dual earthing

plugs.  Likewise, there must be four (or more) CEE-7 standard VII dual earthing electrical

outlets provided, all tied to the same ground.

2.2.1  Dimensions and Weight

These are the approximate dimensions and weight for each electronics tower, color

monitor, UCN cabinet (APM) and printer:

Electronics Tower (each) Advanced Process Manager

(Dual-Access)

Height 72 cm (28.3″) Height 210 cm (81.5”)

Width 32 cm (12.6″) Width 80 cm (31.5”)

Depth 58 cm (22.8″) Depth 80 cm (31.5)”

Weight 45 kg (99.2 lb) Weight 200kg (440 lb)

Printer (ASPI-41) Color Monitor (20”)

Height 17 cm (6.7″) Height 44.9 cm (17.7″)

Width 62 cm (24.4″) Width 49.8 cm (19.6″)

Depth 31 cm (12.2″) Depth 53.4 cm (21.0″)

Weight 14 kg (30.8 lb) Weight 29 kg (63.9 lb)

IDEK Color Monitor (21”) HITACHI Color Monitor (21”)

Height 47.1 cm (18.5″) Height 47 cm (19.7″)

Width 49.2 cm (19.4″) Width 50 cm (18.5″)

Depth 53.6 cm (21.1″) Depth 51 cm (20.1″)

Weight 33 kg (72.7 lb) Weight 34 kg (74.9 lb)

For Advanced Process Manager dimensions and weight, consult Process Manager

/Advanced Process Manager Planning, part of the System Site Planning – 1 binder.

2.3  ELECTRICAL REQUIREMENTS

The customer selected ac power option is installed in the Enhanced Micro TDC3000

Control System before shipment.

The inrush current to each electronics module is limited to 15 A @ 120 V.

2.3.1  AC Voltage Options

120. 240 Vac +10%, -15%

2.3.2  Frequency

47 Hz to 63 Hz

The dual access Advanced Process Manager cabinet is included with the Enhanced Micro

TDC3000 System and is shown for reference in Figure 2-1.  Complete planning and

installation instructions for the Advanced Process Manager are given in the Process

Manager/Advanced Process Manager Planning, part of the System Site Planning – 1 binder

and Process Manager/Advanced Process Manager Installation manual, part of the

Implementation/PM/APM binder

FOXBORO E69F-T12-JRS
ABB REB670 1MRK004822-BB
ABB DSAI130
ABB DSTA002A
ABB 3BDH000610R1 CAC 10-P
KJ4005X1-BA1
KL3103X1-LS1
ABB v18345-1010551001
ABB TBX564
ABB 1HSB495663-1
ABB UNITROL1000
ABB 1VCF752000
ABB 1VCR007346
ABB 1VCF752000
ABB 1VCR007346
 Bentley 330130-040-03-CN
Bentley 177230-01-02-05