Honeywell

Honeywell TDC‑3000 SOE DI IOP,51402625-175 MC‑PDIS12

TDC‑3000 SOE DI IOP,51402625‑175 MC‑PDIS12

on by the Enhanced Micro TDC3000 system—data and programs may be lost.

1.5  EMC DIRECTIVE

The Enhanced Micro TDC3000 system is being brought into compliance with European

guidelines for ElectroMagnetic Compatibility (EMC).  The European EMC directive

(89/366/EEC) requires that an electronics product operate reliably in its intended EMC

environment.  It also requires that the product not detrimentally affect other products

operating in their own environment.

Eventually the Enhanced Micro TDC3000 hardware will display a product certification

label to indicate the hardware is in compliance. This label is placed inside, at the bottom

front of the tower.  As shown in Figure 1-5. a “CE” logo on the product label indicates the

product is in compliance with the European EMC directive along with other descriptive

information about the product

The following publications apply to the Enhanced Micro TDC3000 system and should be

referred to as required and available:

Title

8 Node Enhanced Micro TDC3000 Specification and

Technical Data

8 Node Enhanced Micro TDC3000 User’s Manual [this

pub]

8 Node Multinode Module Service

History Module Service

System Maintenance Guide

Test System Executive

Hardware Verification Test System

Core Module Test System

Maintenance Test Operations

Process Operations Manual

Universal Control Network Planning

Universal Control Network Installation

Universal Control Network Guidelines

Universal Control Network Specification

and Technical Data

51402625-175

PM and APM Planning

Process Manager/Advanced Process Manager

Installation

Process Manager/Advanced Process Manager

Implementation Guidelines

Process Manager/Advanced Process Manager

Checkout

Binder

System Summary – 2

Implementation/8-Node Enhanced Micro

TDC3000

Implementation/8-Node Enhanced Micro

TDC3000

LCN Service – 2

LCN Service – 1

LCN Service – 3

LCN Service – 3

LCN Service – 3

LCN Service – 1

Operation/Process Operations

System Site Planning – 1

Installation/Universal Control Network

Installation/Universal Control Network

System Summary – 2

System Site Planning – 1

Implementation/PM/APM

Implementation/Advanced Process

Manager – 1

Implementation/PM/APM

Process Manager/Advanced Process Manager Service PM/APM/HPM Service -1

Process Manager Module Test System (PMMTS)

PM/APM/HPM Service -2

Process Manager Test System  (PMTS)

Process Manager Test Executive (PMEX)

PM/APM/HPM Service -2

PM/APM/HPM Service -2

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注